Skip to content
ATV tourism properties / Southern West Virginia

Private Trail Access & Land Clearing in Southern WV

Clearing for a cabin, campground, or private access route should begin with a clear destination and a defined scope. Talk with GM Harvey Construction about property access, selective clearing, excavation, and grading on land you own or have authority to improve. The route, slope, and water movement need to be considered together.

Residential site preparation beside a wooded property
Residential site preparation beside a wooded property

Define what the access needs to serve

A construction entrance, guest driveway, maintenance lane, and private recreational path are different projects. Explain who will use the route, which vehicles need to pass, and what the route will connect on your property. Share an existing survey or marked plan if available. Clear boundaries and a specific intended use help avoid opening more ground than the project needs.

Review the ground before choosing a route

Walk through slopes, soft areas, existing drainage, and places where equipment access may be limited. A short route on a map may not be the most workable route on the ground. Discuss the trees and vegetation you want to keep as well as what needs to be removed. The first step is a site conversation, not a fixed clearing allowance based only on acreage.

Connect clearing with the next construction phase

A cleared area still needs to suit the cabin, parking, or site work planned after it. Confirm the proposed building location and equipment movements before opening the site. Coordinate the sequence so access can serve deliveries and construction without being mistaken for the final guest driveway. Discuss what stabilization and surface work belong in the current scope and what will follow later.

Keep private access separate from public trail claims

Clearing land does not authorize entry to someone else’s property or create an approved connection to the Hatfield-McCoy network. Confirm property authority and any proposed riding route with the relevant owners and trail officials before treating it as guest access. Public trail information should come from the trail operator. Ask about the route before promoting a cabin as ride-out lodging.

Bring practical details to the estimate request

Include the property location, approximate route or area, intended use, photos, and any known water or access concerns. Tell Gary if the work is part of a larger cabin or campground plan. The team can discuss what site review and further information are needed to define the work. This page describes private-property construction planning, not public trail construction or trail-system authorization.

Check official trail information

Use the trail operator’s current maps and rules when reviewing a possible guest riding route.

Hatfield-McCoy Trail Maps & DescriptionsHatfield-McCoy Trail Rules
Your next step

Start with the property.

Share the location, planned work, and any access or drainage concerns you already know about.

Request a Free Estimate

Already working with us?

Return to the documents and appointment details shared with you.

Open Client Portal